Nexus CDE — Common Data Environment — INS
04
BIM Collaboration

Nexus CDE — Common Data Environment

"ISO 19650 information management, from first draft to final handover"

Nexus CDE is the shared project space where everyone manages, reviews and approves information. Every file has a clear status and full history, and is visible only to people who are allowed to see it.

ISO 19650IFC 4.3openBIM
At a glance
Category
BIM Collaboration
Licensing
SaaS · SolaaS · Perpetual
Deployment
Cloud · On-premise · Sovereign
Standards
Open APIs · IFC · GeoJSON
Request details
Nexus CDE project dashboard
ISO 19650 project template and status flow
Document viewing and markup tools
Nexus CDE audit log

What it does.

Nexus CDE is an ISO 19650-aligned Common Data Environment for the full asset lifecycle in the AECO industry. It natively combines ISO 19650 project information management, BIM collaboration, infrastructure digital twin, and GeoBIM in a single unified system.

ISO 19650 COMMON DATA ENVIRONMENT Nexus CDE ISO 19650 Core Engine WIP Shared Published BIM COLLAB Clash detection Model federation GeoBIM GIS + BIM fusion Spatial context ISO 19650 Naming convention Approval workflows DIGITAL TWIN Infra lifecycle Sensor integration ISO 19650 · OPENBIM AECO STAKEHOLDERS Architects Engineers Contractors Owners Authorities
Core capabilities

What's inside.

ISO 19650 status flow
ISO 19650 Status Flow
Every document moves through Work in Progress, Shared and Published, with suitability codes and revision numbers. Published versions are locked and cannot be changed. Every status change is recorded with who made it, when, and why.
Smart upload with naming convention validation
Smart Upload & Naming Control
File names are checked against the project's naming convention before upload. Presets for ISO 19650, DIN, ÖNORM and SIA are included. Numbers can be assigned automatically, metadata carries over from the previous version, duplicates are detected, and every file is virus-checked.
Configurable document approval workflow
Approval Workflows
Check, review and authorise documents in configurable workflows, built in a visual designer. Deadlines count working days, reminders go out automatically, and workflows can start on upload. Each completed workflow produces a PDF approval record.
Document viewing and markup tools
View, Mark Up & Compare in the Browser
Open PDFs, Office files, images and videos without leaving the browser. Add markups and stamps, measure lengths and areas, and compare two versions to see exactly what changed.
Nexus CDE issue management
Issue Management
Raise issues on a document or straight from a markup, with a snapshot of the marked area. Assign them to a person or a role, set priorities and due dates, and @mention colleagues. Assigned issues appear in each person's task list.
Nexus CDE document search
Powerful Search & Registers
Search inside PDF, Office and text-file content and IFC model attributes, with filters and saved searches. Export document and model registers to Excel, CSV or PDF.
Project folder and classification permissions matrix
Precise Access Control
Roles, groups and permissions are set per project and per folder, and a matrix shows who can do what and why. Work in progress stays private to its team. People who aren't project members can't see that the project exists.
Nexus CDE audit log
Complete Audit Trail & Data Return
Every action is logged in an audit trail that no one can edit or delete. At project end, get a complete data-return package with all files, registers and the audit trail, plus a certificate confirming data deletion.

Project Templates

Start from an ISO 19650 template with folders, roles, naming rules and workflows already set up.

Container Sets & Smart Links

Group documents into delivery or review packages. Link documents to each other and IFC model elements, and find references inside file content.

Open & Secure

Use a documented REST API (OpenAPI), configurable password and session policies, two-factor authentication, out-of-office stand-ins and a multilingual interface.

Modules

What you get.

01
Common Data Environment

Structured, ISO 19650-compliant document container for all project information across design, construction, and handover phases.

02
Model Coordination

Upload, federate, and visualise BIM models from multiple disciplines with integrated clash detection and markup tools.

03
Issue Tracker

Assign, track, and resolve design and construction issues with status history, responsible parties, and due dates.

04
Transmittal & Approval Workflow

Formalised document issue workflows with configurable review stages, approval statuses, and full audit trail.

05
Version Control & Audit Log

Complete revision history for every document and model, with comparison views and rollback capability.

06
Role-based Access Management

Granular permissions by project, discipline, and document type — supporting multi-party project environments.

Who it's for

Target audiences.

AEC project teams & BIM managers on ISO 19650 projects
Project owners & employer's agents
Public infrastructure agencies
Municipal planning departments
Engineering practices & general contractors
See it live

See Nexus CDE
in your environment.

We'll walk you through the platform with real-world scenarios matching your use case. Our team typically responds within one business day.

Request a demo Get technical specs
Real-world scenarios matching your use case
No commitment required
Response within 1 business day
Sandbox access available
← Previous
Nexus DBL
Next →
Nexus Optimo